- New entry rules for freight transport in Alabuga SEZ: Electronic passes only 01.12.2024
- Consul General of China: Alabuga is the most successful special economic zone in Europe 27.11.2024
- Maxim Reshetnikov notes the effective work of the Novgorodskaya SEZ 16.11.2024
- New development opportunities: Alabuga SEZ participates in the ROSTKI international forum 15.11.2024
- The first train departs to China from the One Belt One Road container terminal 31.10.2024
- The art of defensive warfare: Renowned historian Alexei Isaev delivered a lecture to students at Alabuga Polytech 28.10.2024
- Alabuga Polytech students have planted three thousands trees in Nizhnekamsk 22.10.2024
- During the meeting with Xi Jinping, Vladimir Putin emphasized his high regard for the development of Alabuga's logistics complex 22.10.2024
- Anton Alikhanov, the Head of the Ministry of Industry and Trade of the Russian Federation: Alabuga Polytech is pivotal in cultivating skilled personnel essential for advancing the domestic industry 07.10.2024
- Rustam Minnikhanov announces ambitious goal: 10,000 Students to enroll at Alabuga Polytech by 2025 27.09.2024
- Andrey Nikitin discusses Novgorodskaya Special Economic Zone development with Vladimir Putin 11.09.2024
- Turkish Ambassador to Russia visits Alabuga SEZ 03.09.2024
- "Education is an investment in the future": Alabuga International School Celebrates Its 10th Anniversary 02.09.2024
- Over 3000 students are selected for Alabuga Polytech: “Nurturing future leaders committed to changing the world for the better” 01.09.2024
- Investing talent and energy: A student from Alabuga Polytech discusses the July progress at the construction site of Russia's largest logistics complex 09.08.2024
- An Alabuga Polytech student designs headquarters and wins TIM Leaders 2024 All-Russia competition 05.08.2024
- Non-Stop Construction: The rapid expansion of Russia's largest logistics complex in just six months 10.07.2024
- Alabuga SEZ is the efficiency leader in 2023: The Ministry of Economic Development of the Russian Federation 03.07.2024
- The construction of Russia's largest logistics complex: continuous progress and major developments 14.06.2024
- Europe’s premier SEZ now connects Moscow and St. Petersburg with official opening of Novgorodskaya Special Economic Zone’s production building in Velikiy Novgorod 13.06.2024
- VTB Bank and Tatarstan sign an agreement to strengthen partnership, boosting cooperation to 755 billion rubles 06.06.2024
- IGS Agro, the resident of Alabuga SEZ harvests record-breaking amounts of champignons 03.06.2024
- Good preconditions for the expansion of Belarusian-Tatarstan relations - Deputy Prime Minister of the Republic of Belarus visits the Alabuga SEZ 23.05.2024
- VTB Bank opens its office on the territory of Alabuga SEZ 23.05.2024
- We nurture the personnel for the industrial sector - Deputy Head of the Ministry of Industry and Trade of the Russian Federation appreciates the work of Alabuga Polytech 16.05.2024
- “This is the future” – Turkey’s leadership about Alabuga Polytech 19.04.2024
- The main thing is not to be afraid to talk to people – Alabuga Polytech hosts all-Russian school students’ entrepreneurship challenge 15.04.2024
- “Our team is operating at full capacity”: The Role of Alabuga Polytech College's student in the largest Russian-Chinese project 09.04.2024
- SEZ Alabuga’s CEO commented on the drone strike 02.04.2024
- We are shaping the future with young minds: A student from Alabuga Polytech is creating power output diagrams for Russia's largest logistics complex 19.03.2024
Alabuga Development will reconstruct Yoshkar-Ola treatment facilities
02.10.2020
The construction company "Alabuga Development" will be engaged in the reconstruction of sewage treatment facilities in the city of Yoshkar-Ola.Alabuga Development won the tender for the reconstruction of the treatment facilities with a total area of the projected site of 211 thousand m2.
Wastewater treatment plants in Yoshkar-Ola, built in 1967, require reconstruction due to significant wear and tear of fixed assets. Currently, the total amount of wastewater treated at the Wastewater Treatment Plant is 85 thousand m3.
The start of the first stage of implementation is scheduled for the 4th quarter of 2020. The first stage included energy facilities, waste and sludge mixture supply stations, activated sludge feed stations and a station for placing blowing equipment, as well as large-scale repair and restoration work on biological treatment facilities: secondary sedimentation tanks, aeration tanks. All work is planned to be completed by June 2024.
Reconstruction of the sewage treatment facilities of the Mari capital is planned as part of the federal project "Rehabilitation of the Volga" of the national project "Ecology". The main task of which is to reduce the volume of polluted wastewater discharged into the Volga River by three times.
Since 2017, the company has completed a large amount of work on the modernization of water utility facilities, including district treatment facilities and a water treatment plant in Yelabuga.
The work on the construction of the USC will optimize their productivity, taking into account the needs of the city and its future development. Design work for the modernization of the facility will be carried out using modern techniques and technologies. The introduction of a biological method for removing biogenic elements will make it possible to minimize the negative impact on the environment and guarantee the degree of wastewater treatment in accordance with all sanitary and environmental standards in force in the Russian Federation
Share