- New entry rules for freight transport in Alabuga SEZ: Electronic passes only 01.12.2024
- Consul General of China: Alabuga is the most successful special economic zone in Europe 27.11.2024
- Maxim Reshetnikov notes the effective work of the Novgorodskaya SEZ 16.11.2024
- New development opportunities: Alabuga SEZ participates in the ROSTKI international forum 15.11.2024
- The first train departs to China from the One Belt One Road container terminal 31.10.2024
- The art of defensive warfare: Renowned historian Alexei Isaev delivered a lecture to students at Alabuga Polytech 28.10.2024
- Alabuga Polytech students have planted three thousands trees in Nizhnekamsk 22.10.2024
- During the meeting with Xi Jinping, Vladimir Putin emphasized his high regard for the development of Alabuga's logistics complex 22.10.2024
- Anton Alikhanov, the Head of the Ministry of Industry and Trade of the Russian Federation: Alabuga Polytech is pivotal in cultivating skilled personnel essential for advancing the domestic industry 07.10.2024
- Rustam Minnikhanov announces ambitious goal: 10,000 Students to enroll at Alabuga Polytech by 2025 27.09.2024
- Andrey Nikitin discusses Novgorodskaya Special Economic Zone development with Vladimir Putin 11.09.2024
- Turkish Ambassador to Russia visits Alabuga SEZ 03.09.2024
- "Education is an investment in the future": Alabuga International School Celebrates Its 10th Anniversary 02.09.2024
- Over 3000 students are selected for Alabuga Polytech: “Nurturing future leaders committed to changing the world for the better” 01.09.2024
- Investing talent and energy: A student from Alabuga Polytech discusses the July progress at the construction site of Russia's largest logistics complex 09.08.2024
- An Alabuga Polytech student designs headquarters and wins TIM Leaders 2024 All-Russia competition 05.08.2024
- Non-Stop Construction: The rapid expansion of Russia's largest logistics complex in just six months 10.07.2024
- Alabuga SEZ is the efficiency leader in 2023: The Ministry of Economic Development of the Russian Federation 03.07.2024
- The construction of Russia's largest logistics complex: continuous progress and major developments 14.06.2024
- Europe’s premier SEZ now connects Moscow and St. Petersburg with official opening of Novgorodskaya Special Economic Zone’s production building in Velikiy Novgorod 13.06.2024
- VTB Bank and Tatarstan sign an agreement to strengthen partnership, boosting cooperation to 755 billion rubles 06.06.2024
- IGS Agro, the resident of Alabuga SEZ harvests record-breaking amounts of champignons 03.06.2024
- Good preconditions for the expansion of Belarusian-Tatarstan relations - Deputy Prime Minister of the Republic of Belarus visits the Alabuga SEZ 23.05.2024
- VTB Bank opens its office on the territory of Alabuga SEZ 23.05.2024
- We nurture the personnel for the industrial sector - Deputy Head of the Ministry of Industry and Trade of the Russian Federation appreciates the work of Alabuga Polytech 16.05.2024
- “This is the future” – Turkey’s leadership about Alabuga Polytech 19.04.2024
- The main thing is not to be afraid to talk to people – Alabuga Polytech hosts all-Russian school students’ entrepreneurship challenge 15.04.2024
- “Our team is operating at full capacity”: The Role of Alabuga Polytech College's student in the largest Russian-Chinese project 09.04.2024
- SEZ Alabuga’s CEO commented on the drone strike 02.04.2024
- We are shaping the future with young minds: A student from Alabuga Polytech is creating power output diagrams for Russia's largest logistics complex 19.03.2024
"Alabuga" launches the reconstruction of the heating network complex
SEZ "Alabuga" has started the first stage of reconstruction of its own heating network complex. A tender for design and survey works to expand the boiler plant and the construction of block-modular boiler houses has been announced. The cost of this stage will be more than 25 million rubles. The purpose of large-scale reconstruction is to increase the efficiency and reliability of heat supply for residents of the SEZ.
As part of the reconstruction of the heating network complex, the existing heat power plant in the territory of "Alabuga" will be replaced by new energy-efficient block-modular boiler-houses - in addition to the residents of the special economic zone, they will also be connected to “Elaz” and enterprises on the industrial site "Alabuga", which now receive heat from the CHP. After the construction of block-modular boiler houses, the old heat power plant will be decommissioned.
The need for reconstruction of heat power plant is caused by excessive costs for its maintenance, which are not covered by the regulating tariff. Now the out-of-date equipment of the power plant operates only in the boiler-house mode with the installed heat output of 420 Gcal/h, while the load does not exceed 10 percent of the maximum capacity. As a result of the reconstruction, "Alabuga" will increase the efficiency of its heating network complex and will make heat supply more reliable for the connected enterprises.
Share