- New entry rules for freight transport in Alabuga SEZ: Electronic passes only 01.12.2024
- Consul General of China: Alabuga is the most successful special economic zone in Europe 27.11.2024
- Maxim Reshetnikov notes the effective work of the Novgorodskaya SEZ 16.11.2024
- New development opportunities: Alabuga SEZ participates in the ROSTKI international forum 15.11.2024
- The first train departs to China from the One Belt One Road container terminal 31.10.2024
- The art of defensive warfare: Renowned historian Alexei Isaev delivered a lecture to students at Alabuga Polytech 28.10.2024
- Alabuga Polytech students have planted three thousands trees in Nizhnekamsk 22.10.2024
- During the meeting with Xi Jinping, Vladimir Putin emphasized his high regard for the development of Alabuga's logistics complex 22.10.2024
- Anton Alikhanov, the Head of the Ministry of Industry and Trade of the Russian Federation: Alabuga Polytech is pivotal in cultivating skilled personnel essential for advancing the domestic industry 07.10.2024
- Rustam Minnikhanov announces ambitious goal: 10,000 Students to enroll at Alabuga Polytech by 2025 27.09.2024
- Andrey Nikitin discusses Novgorodskaya Special Economic Zone development with Vladimir Putin 11.09.2024
- Turkish Ambassador to Russia visits Alabuga SEZ 03.09.2024
- "Education is an investment in the future": Alabuga International School Celebrates Its 10th Anniversary 02.09.2024
- Over 3000 students are selected for Alabuga Polytech: “Nurturing future leaders committed to changing the world for the better” 01.09.2024
- Investing talent and energy: A student from Alabuga Polytech discusses the July progress at the construction site of Russia's largest logistics complex 09.08.2024
- An Alabuga Polytech student designs headquarters and wins TIM Leaders 2024 All-Russia competition 05.08.2024
- Non-Stop Construction: The rapid expansion of Russia's largest logistics complex in just six months 10.07.2024
- Alabuga SEZ is the efficiency leader in 2023: The Ministry of Economic Development of the Russian Federation 03.07.2024
- The construction of Russia's largest logistics complex: continuous progress and major developments 14.06.2024
- Europe’s premier SEZ now connects Moscow and St. Petersburg with official opening of Novgorodskaya Special Economic Zone’s production building in Velikiy Novgorod 13.06.2024
- VTB Bank and Tatarstan sign an agreement to strengthen partnership, boosting cooperation to 755 billion rubles 06.06.2024
- IGS Agro, the resident of Alabuga SEZ harvests record-breaking amounts of champignons 03.06.2024
- Good preconditions for the expansion of Belarusian-Tatarstan relations - Deputy Prime Minister of the Republic of Belarus visits the Alabuga SEZ 23.05.2024
- VTB Bank opens its office on the territory of Alabuga SEZ 23.05.2024
- We nurture the personnel for the industrial sector - Deputy Head of the Ministry of Industry and Trade of the Russian Federation appreciates the work of Alabuga Polytech 16.05.2024
- “This is the future” – Turkey’s leadership about Alabuga Polytech 19.04.2024
- The main thing is not to be afraid to talk to people – Alabuga Polytech hosts all-Russian school students’ entrepreneurship challenge 15.04.2024
- “Our team is operating at full capacity”: The Role of Alabuga Polytech College's student in the largest Russian-Chinese project 09.04.2024
- SEZ Alabuga’s CEO commented on the drone strike 02.04.2024
- We are shaping the future with young minds: A student from Alabuga Polytech is creating power output diagrams for Russia's largest logistics complex 19.03.2024
SEZ "Alabuga" will spend more than 243 million rubles for the modernization of Elabuga water supply
"Alabuga" continues works on reconstruction and modernization of Elabuga water supply and sewerage. A tender for the modernization of 8 sewage pumping stations and the construction of a new reservoir of drinking water for 20,000 cubic meters has been announced. Modernization of water and sewage networks "Alabuga" leads at the expense of its own funds.
At the next stage of reconstruction and modernization of the sewerage system in Elabuga, obsolete equipment will be replaced at 8 sewage pumping stations. Stations will be largely automated, and the equipment will be managed using dispatching systems. Also construction of a new reservoir of drinking water with a capacity of 20,000 cubic meters at a water treatment plant is planning. Now there is one such tank at the water purification station, in case of an emergency shutdown of the water supply from the water intake, this stock is enough for a day. After the construction of an additional tank, a constant supply of drinking water for enterprises of the SEZ "Alabuga" and residents of Elabuga will double.
During modernization works, sewer networks in the center of Elabuga will also be reconstructed. At the moment, the collector does not function there after the failure of the networks. Works on reconstruction, modernization and construction are planned to be completed by July 2019. The total cost of works is 243.6 million rubles.
In 2017, the SEZ Alabuga upgraded more than 1.5 km of water supply and sewerage networks, replaced about 3 km of sewage networks, a filter element at a water treatment plant. Also, shut-off valves in the water pipeline are replaced - new equipment allows not to allow a mass outage of water in the city; In cases of accidents, only the fragments of the water conduit are cut off with the new shut-off valve.
Share