- Alabuga SEZ is the efficiency leader in 2023: The Ministry of Economic Development of the Russian Federation 03.07.2024
- The construction of Russia's largest logistics complex: continuous progress and major developments 14.06.2024
- Europe’s premier SEZ now connects Moscow and St. Petersburg with official opening of Novgorodskaya Special Economic Zone’s production building in Velikiy Novgorod 13.06.2024
- VTB Bank and Tatarstan sign an agreement to strengthen partnership, boosting cooperation to 755 billion rubles 06.06.2024
- IGS Agro, the resident of Alabuga SEZ harvests record-breaking amounts of champignons 03.06.2024
- Good preconditions for the expansion of Belarusian-Tatarstan relations - Deputy Prime Minister of the Republic of Belarus visits the Alabuga SEZ 23.05.2024
- VTB Bank opens its office on the territory of Alabuga SEZ 23.05.2024
- We nurture the personnel for the industrial sector - Deputy Head of the Ministry of Industry and Trade of the Russian Federation appreciates the work of Alabuga Polytech 16.05.2024
- “This is the future” – Turkey’s leadership about Alabuga Polytech 19.04.2024
- The main thing is not to be afraid to talk to people – Alabuga Polytech hosts all-Russian school students’ entrepreneurship challenge 15.04.2024
- “Our team is operating at full capacity”: The Role of Alabuga Polytech College's student in the largest Russian-Chinese project 09.04.2024
- SEZ Alabuga’s CEO commented on the drone strike 02.04.2024
- We are shaping the future with young minds: A student from Alabuga Polytech is creating power output diagrams for Russia's largest logistics complex 19.03.2024
- The next generation of experts is emerging. Here is our report from the Business Process Automation Challenge at Alabuga Polytech 18.03.2024
- The Year of Academic and Technological Growth in Tatarstan – Alabuga Polytech gathers young programmers from all over Russia 14.03.2024
- «Ultimate experience for schoolkids»: Alabuga SEZ hosts the first «Alabuga STEM» International Scientific and Practical Conference 14.03.2024
- Alabuga SEZ at World Youth Festival 13.03.2024
- Alabuga will always act in the interests of our country 23.02.2024
- Great example and high-demand fields of study - Vladimir Putin about Alabuga Polytech 22.02.2024
- The success secrets – Mari El’s leadership learns from the experience of the best SEZ in Russia 14.02.2024
- Alabuga Polytech students become prizewinners at Alabuga Skills professional skills competition 12.02.2024
- We Need To Give An Opportunity For Young Guys To Work – Rais of Tatarstan Backs SEZ Alabuga's Pilot Project to Employ Young People 12.02.2024
- We cannot imagine how Alabuga will grow without Alabuga Polytech 12.02.2024
- It is more than just a construction project: the building works progress at the site of the largest logistics terminal in Russia 09.02.2024
- For those who like to play long-term – Rustam Minnikhanov takes part in the opening ceremony of a new plant at Alabuga SEZ 31.01.2024
- Well done, Alabuga! Much work has been done! – Rustam Minnikhanov about Yuzhniy Park residential complex. 31.01.2024
- We would like to learn from the best – Primorskiy region government’s deputy chairman about his visit to Alabuga SEZ 29.01.2024
- Alabuga Polytech is a place where they create new things and never stop growing and developing – Ramil Mullin, the Mayor of Nizhnekamsk, about Alabuga Polytech 18.01.2024
- Kastamonu plant, the resident of Alabuga SEZ, increases sales of laminate and fiberboards in 2023 16.01.2024
- August-Alabuga produces the record volume of crop protection agents 11.01.2024
Synergy 2: industrial park ready for operation
On April 30, Industrial Park “Synergy 2” received a conclusion “On the compliance of the constructed capital facility with the requirements of the technical regulations and design documents, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with meters for using energy resources”.
“Synergy 2”, consisting of 2 buildings, engineering and road infrastructure, received a positive conclusion from the design documentation issued by the state construction supervision.
The facility is equipped with meters for used energy resources: electricity, water, heat and gas.
The construction of the industrial park Synergy 2 began on October 1, 2018. The premises are equipped with all the ready-made infrastructure for the production of: - electrical, -heat, -water supply, air handling unit in each module, automatic fire fighting system, security and surveillance systems, parking for cars and euro trucks, IP-telephony and the Internet, as well as access to customs infrastructure, checkpoint, engineering networks, roads and the railway terminal. The project was implemented with the support of resolution of the Russian Federation Government No. 1119 “On the selection of constituent entities of the Russian Federation eligible to receive state support in the form of subsidies for the reimbursement of costs for the creation, modernization and (or) reconstruction of infrastructure of industrial parks ...”.
Companies that have placed their production facilities in the industrial park and have Synergy 2 received SEZ resident status are exempted from land, property and transport taxes for 10 years. Income tax will be 2% for the first 5 years. The regime of a free customs zone allows the import of foreign goods without payment of customs duties and VAT.
For reference:
Industrial Park "Synergy 2" is a unique complex of ready-made premises of a modular type with gas supply and an independent air handling unit in each module. Total area - 75 900 m². The park consists of 20 modules and is equipped with all the finished infrastructure for the production. The general contractor is Alabuga Development LLC.
Share